logo
  • Home
  • Products
    • Pre-made Pouch Machines
    • Case Packers
  • Events
  • About Us
  • Contact Us

Current Number Of Operators
Average Hourly Wage
Working Hours (Average) Per Year
Estimated Machine Cost
Current Annual labor cost
Labor cost after automation*
Annual savings
Payback period (months)
* Assuming 2 people per machine
Disclaimer: ROI figures are estimates based on the information provided and are intended for planning purposes only. Actual results may vary based on operating conditions, labor costs, production volumes, machine configuration